16 October 2026

Will Your Roof Take Commercial Solar? A Manchester Roof Check

Can your factory, mill or warehouse roof in Manchester carry commercial solar? Roof loading, asbestos cement sheets, remaining roof life and what a survey checks.

Most businesses in Greater Manchester that ask about commercial solar have already done the sums on the electricity. The question that sinks more projects is the roof. Will it take commercial solar at all? Plenty of the county’s industrial stock was built well before anyone thought of putting a 25-year power station on top of it. There are 1960s portal-frame sheds in Trafford Park, mid-century weaving sheds around Bolton and Wigan, and brick mills from the 1800s. A typical framed array adds roughly 12 to 15 kg per square metre. HSE says any building built or refurbished before 2000 may contain asbestos, and that covers a big share of the sheds still in use. HSE also puts falls through fragile surfaces, mostly fibre-cement sheets and rooflights, at 22% of fatal falls from height in construction. Here’s how to work out whether your roof is a candidate before you pay for a design.

Will your roof take commercial solar? Start with three questions

Before anyone talks about panels or inverters, there are three things to establish about the building. Can the structure carry the extra load and resist the wind? What are the roof sheets made of? How many good years does the roof have left?

Older industrial shed with a corrugated cement sheet roof and painted cladding, the type of roof that needs checking before solar

If you can answer all three with confidence, the rest of the design tends to fall into place. If you can’t, that’s normal. Most facilities managers we speak to know the age of the building roughly and not much else, especially where a company has moved into premises somebody else built. The deeds, an old asbestos register or a set of drawings from a previous refurbishment can save a lot of guesswork.

These checks come before the yield modelling and grid application described on our page about commercial solar panels for Manchester businesses. There’s no point designing a 200kW array for a roof that needs replacing in four years.

Roof loading: weight, wind and the purlins underneath

Solar adds two kinds of load to a roof. One is dead load, the weight of the panels, rails and fixings sitting there permanently. The other is wind load, and on a lightweight industrial roof that’s often the one that decides things.

Red steel frame and purlins supporting a metal roof inside an industrial building

A modern panel weighs a little over 20kg and covers about two square metres. Add the mounting rails and you’re at roughly 12 to 15 kg per square metre on a pitched or profiled metal roof. That’s not much, but many older sheds were designed with very little spare capacity. Purlins might be light cold-rolled steel sections at wide spacings, or timber on older buildings, and some have rusted or been notched for services over the years.

Wind is the harder part. Panels act like a sail, and the uplift is strongest along the edges and corners of a roof. On a high, exposed site, think of the units on the moorland edge around Horwich and Westhoughton rather than a sheltered yard in Cheetham Hill, those forces go up. The fixings have to hold the rails to the roof, and the roof has to hold on to the frame.

Flat roofs bring a different problem. Ballasted systems are weighed down with concrete blocks so nothing penetrates the membrane. That’s kinder to the waterproofing, but it can add two or three times the load of a fixed system, which plenty of 1970s office and warehouse decks were never designed for.

Asbestos cement sheeting on Greater Manchester sheds

Corrugated asbestos cement was the default roof covering for cheap industrial buildings for decades. A lot of it is still up there, greyed and mossy, on estates across Salford, Leigh and East Manchester.

Danger asbestos hazard tape stretched across a site fence

If you’re responsible for a non-domestic building, you probably already hold the legal duty here. HSE’s guidance on the duty to manage asbestos in buildings says the dutyholder has to find out whether asbestos is present, presume a material contains it unless there’s strong evidence it doesn’t, keep a register and share it with anyone who might disturb it. A solar installer drilling for rail fixings is exactly that person, so they should be asking you for the register.

Asbestos cement is one of the lower-risk asbestos materials, and HSE says most work on it can be done without a licence if the workers are properly trained. That doesn’t make it a good surface to bolt a solar array to. Weathered sheets get brittle, drilling releases fibres, and the sheets are fragile underfoot. HSE’s page on fragile surfaces expects work on or near them to be avoided where possible, with staging, guard rails and fall arrest used for any work that can’t be.

In practice, most asbestos cement roofs end up over-clad. New profiled steel sheets go on spacers above the old ones, screwed through to the purlins, and the panels are mounted on the new skin while the old sheets stay sealed underneath. Stripping the roof and re-sheeting it gets the asbestos out of the building for good, but it costs more and the space below usually has to be cleared while it happens. And sometimes the sensible call is to leave the roof alone and put the panels somewhere else on the site.

How many good years has the roof got left?

Solar panels typically carry 25-year performance warranties and often keep working beyond that. The roof underneath needs to last as long, or you’ll be paying to lift the whole array off and put it back halfway through.

Rusting curved metal roof sheets against a blue sky, showing a roof near the end of its life

On coated steel sheets, the early warning is usually cut-edge corrosion. The coating peels back from the cut ends of the sheets at the laps and gutters, and rust creeps in. It tends to show after 15 to 20 years, and it’s treatable if caught early. Rooflights go brittle and discoloured. Felt flat roofs on older office blocks crack and blister, and many will want replacing well inside a 25-year window.

Taking an array off mid-life means scaffold, labour, storage, refitting, electrical re-testing and weeks of lost generation. That cost doesn’t vanish if you lease or sign a PPA instead of buying, either. Our guide to paying for commercial solar in Manchester makes the same point from the money side: sort the roof first.

A refurbishment doesn’t always mean a full re-roof. Treating cut edges, replacing rooflights and coating the sheets can add years at a fraction of the price. The survey should tell you which you need.

Roof types on Manchester mills, warehouses and industrial units

Greater Manchester has an unusually mixed set of commercial roofs, partly because so much of it is industrial building stock from different eras still in use.

Black and white view across industrial buildings with ridged and flat roofs under an overcast sky

Portal-frame sheds, 1960s to 1980s

Steel portal frames with fibre-cement or early coated-steel sheets. Common across Trafford Park, Wythenshawe and the older estates in Wigan. These are the roofs most likely to have asbestos and the least spare load capacity, but their wide, shallow pitches work well for solar once the covering is sorted.

Modern sheds with insulated panels

From the 1990s onwards most new warehouses went up with composite insulated panels or built-up metal cladding. Structurally these are usually the easiest roofs to work with. Insurers do take an interest in what the panel core is made of and how cables are routed, so expect questions about fire safety.

Weaving sheds with northlight roofs

Single-storey weaving sheds with sawtooth “northlight” roofs are scattered across the old Lancashire towns in the north and west of the county. The glazed slopes face north for even daylight, so the solid slopes face roughly south, which is handy for solar. The trouble is age: slate or old sheeting, timber or cast-iron structure, and valley gutters that need to stay clear.

Brick mills

Multi-storey mills often have heavy timber or iron roof structures with slate coverings, though some later mills have flat sections or towers that once held sprinkler tanks. Many are listed or in conservation areas, which turns it into a planning question as much as a structural one. Our planning permission guide covers that side.

What a commercial solar structural survey actually checks

A proper roof survey is more than someone looking at satellite images. For anything beyond a small array, it should end with written findings and, where needed, calculations from a structural engineer.

Engineer writing up survey notes at a desk with two white hard hats beside her

Expect it to cover:

  • The roof covering: sheet type and profile, condition, any asbestos, rooflight positions and fragile areas.
  • The structure: purlin size, spacing and condition, frame type, and any signs of corrosion, rot or past alterations.
  • Load calculations for dead load, wind uplift and snow, including the higher wind zones at edges and corners.
  • Fixings: which brackets suit the sheet profile, and whether they fix into the purlins or clamp to standing seams.
  • Drainage, gutters and valleys, so panels don’t block water paths.
  • Safe access and edge protection, both for the installation and for future maintenance.
  • Cable routes down through the building and fire separation where they pass through.

For systems up to 50kW, installers working under MCS have to follow its installation standards. The MCS standards library includes MIS 3002 for solar PV, which requires the roof’s ability to carry the system to be checked. Larger commercial jobs sit outside MCS, but the same engineering applies, and your insurer or landlord will usually want to see the report.

When the roof says no

Sometimes the honest answer is that the roof isn’t ready, or never will be. That isn’t the end of the project.

Row of old profiled roof sheets along a roofline under a grey sky

If the roof needs replacing in the next few years anyway, combining the re-roof and the solar into one project saves on scaffold and access, and the new roof can be specified with the array in mind. Over-cladding an asbestos cement roof does a similar job for less disruption.

If the building is listed, rented on a short lease or simply too weak, look at the rest of the site. A yard or spare land can take a ground-mounted solar array, and staff car parks can carry solar carport canopies that generate power and keep the rain off. Neither puts any load on the building at all.

Whatever shape your roof is in, the first step is the same: a site visit, a look at the asbestos register and drawings if you have them, and a straight answer on what the roof can take. Book a roof and site check for commercial solar

Frequently asked questions

How much weight does commercial solar add to a roof?

A rail-mounted array on a pitched or profiled metal roof usually adds somewhere around 12 to 15 kg per square metre, panels and rails together. Ballasted systems on flat roofs, held down by concrete blocks rather than fixings, can add two or three times that. The weight is only half of it, though. On a lightweight shed the bigger question is often whether the purlins and fixings can resist wind trying to lift the panels off.

Can solar panels go on an asbestos cement roof?

Not by fixing straight through the old sheets. Asbestos cement is fragile and HSE treats it as a material to be managed, so drilling it for rails is a poor idea. The usual answers are over-cladding the roof with new steel sheets fixed through to the purlins and mounting the panels on those, or replacing the sheets entirely. If neither stacks up, a ground mount or solar carport may be the better route.

Does a commercial solar installation need a structural survey?

It should. MCS's installation standard requires the installer to check the roof can carry the system, and for larger commercial arrays a structural engineer normally produces calculations for dead load, wind uplift and snow. Insurers and landlords often ask to see that report before work starts, so it's worth having in writing.

How many years should a roof have left before fitting solar panels?

Ideally at least as long as the panels will be there, which is usually 25 years or more. If the roof sheets, coating or membrane will need replacing within that time, it's normally cheaper to do the roof first. Lifting an array off and putting it back later means scaffold, labour, re-testing and lost generation.

Thinking about solar or a battery for your site?